Pilgrims Projects • 269-945-5079 (Mon-Fri 9-5:00 p.m. E.S.T.)
Roslau Piano Wire is Imported from Germany. It has long been considered the "Blue Chip" of the steel industry. Because of its exacting requirements, only the finest grade steel of precise chemical analysis is used in its manufacture. To help assure beauty of tone, it must be exceedingly uniform in thickness and roundness. Tolerances are held to .0003". This wire is the finest you can buy. Available in polished finish only. Measured by American Standard Music Guage.
1/4 Pound Music Wire 4/0 ga to 0 ga
1/4 Pound Music Wire 1 ga to 4 ga
1/2 Pound Music Wire 5 ga to 11 ga
1/2 Pound Music Wire 12 ga to 15 ga
45 Inches of Loop End Music Wire
4/0 ga to 15 ga
Looping Tool for making Loop End Strings T44
5-1/2 Inches Long to be clamped in a vise or to a workbench. Both traditional Bass string type loops and German Small coil loops can be made easily.
Comes with detailed instructions.
Wire Size and Diameter
3/0 - .007 dia - 7,462 ft per lb
2/0 - .008 dia - 5,714 ft per lb
0 - .009 dia - 4,545 ft per lb
1 - .010 dia - 3,700 ft per lb
2 - .011 dia - 3,033 ft per lb
3 - .012 dia - 2,560 ft per lb
4 - .013 dia - 2,170 ft per lb
5 - .014 dia - 1,886 ft per lb
6 - .016 dia - 1,428 ft per lb
7 - .018 dia - 1,136 ft per lb
Wire Size and Diameter
8 - .020 dia - 917 ft per lb
9 - .022 dia - 757 ft per lb
10 - .024 dia - 636 ft per lb
11 - .026 dia - 540 ft per lb
12 - .029 dia - 440 ft per lb
12-1/2 - .030 dia - 415 ft per lb
13 - .031 dia - 390 ft per lb
13-1/2 - .032 dia - 366 ft per lb
14 - .033 dia - 350 ft per lb
14-1/2 - .034 dia - 328 ft per lb
15 - .035 dia - 306 ft per lb
Music Wire