About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
Email Us
Home

Our Violin drawings are all full sized. Many are taken directly from original instruments.
In addition to plans and templates, we offer Cremona Style Violin Molds. If you are in need of a mold not stocked by us, we do build custom molds from a drawing you supply. Contact us for details.

Medieval Fiedel Plans
(Flat top predecessor to the Viol)
S22

$6.50

Inside Mold for Violin
Stradivarius Model (c. 1713)
Designed by H.E. Brown
S34

$3.00

Violin Table Pattern (Amati)
Includes Arches and Graduations
AUTHENTIC
S35


$3.50

Violin Table Pattern (Stainer)
Includes Arches
AUTHENTIC S36

$2.50

Violin Table Pattern (Maggini)
Includes Arches
AUTHENTIC
S38

$2.50

Baroque Violin, Original "Shortneck"
Style Plans S39

Complete instrument Drawing by F.E. LaBarre
Includes Text

$6.50

$2.00

Violin "F" Hole Pattern for Stradivarius Violin i24
Precision Die-Cut Pattern of Tough Heavy Guage Acetate Material

$2.00

Violin "F" Hole Pattern for Guarnerius
Violin i25

Precision Die-Cut Pattern of Tough Heavy Guage Acetate Material

$3.00

Guarnerius 4/4 Violin Body Pattern i26
Precision Die-Cut Pattern of Tough Heavy Guage Acetate Material
Stradivarius 4/4 Violin Body Pattern i27
Precision Die-Cut Pattern of Tough Heavy Guage Acetate Material

$3.00

Violin Neck Pattern i28
Precision Die-Cut Pattern of Tough Heavy Guage Acetate Material

$2.00

Violin Molds
For use with the violin plans we offer. Very High quality Cremona type.
Made of 3/4 inch material. These are each made by hand, and not mass produced.

We also offer to make custom molds for your own design.

The price is $65.00 and you provide the full-sized outline of the top of the instrument on a sheet of paper.
Delivery time is usually 2 weeks. Please call for further information

 

$45.00 per Size

Select Violin Design

Violin Plans