About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
Email Us
Home

We are an authorized dealer for Seymour Duncan products. By purchasing from us, you are assured of professional and efficient service.

Manufacturer's Warranty applies.

The Tone Wizard
Choosing and Installing the Right Pickup
FAQ
Warranty Information

Seymour Duncan SH-PG1 Pearly Gates Trembucker Pickup    
Item Number 11103-49

Retail Price: $135.00

Trembucker: For use where Bridge string spacing exceeds 2.00" (50mm) measured center of high string to center of low string (Strat's, etc)

This humbucker was originally designed for that distinctive Texas Blues-Rock sound! 
The tone is round with singing sustain.  Ther's lots of edge to cut through, but it's not harsh.  You get a smooth breakup even on small amps.  It has all the distinctive qualities of a custom made pickup.
The calibreated Alnico ll magnet perfectly matches the coil's resonant frequency for even response and output.  A Pearly Gates neck and bridge used together will give you a raw blues humbucker setup.
Neck and bridge position models are specially calibrated to their positions for an even volume balance.
This pickup is a direct replacement and requires no guitar modification.  Wiring schematic and mounting screws are included. 

application
Warm, slightly-hotter-than-vintage humbucker. Great for blues, classic rock, southern rock, jam, and hard rock.

description
Originally designed as a recreation of the pickups in the '59 Les Paul® Standard that defined the raw, rebellious sound of Texas blues-rock. The Pearly Gates is sweet, but slightly rude, with great sustain and a bright top end that make harmonics jump out of the guitar. Comes with four-conductor hookup cable.

complete setup
Often used in both neck and bridge positions. Can be used in the bridge with an APH-1n Alnico II Pro in the neck for smoother tones; or, a Pearly Gates in the neck with an SH-11 Custom Custom for heavier rock sounds from the bridge position.

guitars
For brighter toned instruments. Works especially well with maple and ebony fingerboards. Also works great with hollow and semi-hollow body guitars.

players
Dickey Betts (neck & bridge), Warren Haynes/ Gov't Mule (neck & bridge), Howard Leese / Heart (neck & bridge), Greg Martin / Kentucky Headhunters (neck & bridge)

SH-PG1b Pearly Gates Trembucker Bridge Pickup
Our Price: $94.95
Select Color

See more Electric Guitar Pickups
Ships Free in the US
International Shipping Priority

$20.00

International Shipping Express

$30.00