About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
Email Us
Home

We are an authorized dealer for Seymour Duncan products. By purchasing from us, you are assured of professional and efficient service.

Manufacturer's Warranty applies.

The Tone Wizard
Choosing and Installing the Right Pickup
FAQ
Warranty Information

SeymSeymour Duncan SH-6 Duncan Distortion Trembucker Pickup    
Item Number 11103-21-B

Retail Price: $104.00

Trembucker: For use where Bridge string spacing exceeds 2.00" (50mm) measured center of high string to center of low string (Strat's, etc)

The Duncan Distortion gives you a high output while retaining clarity;.  A massive ceramic magnet and hot symmetrical coils give this pickup tight puchy lows and a searing high end that really cuts through.  Put a pair of these in your guitar for tremendous power and a raw distroted rock sound.

Four conductor cable

This pickup is a direct replacement and requires no guitar modification.  Wiring schematic and mounting screws are included. 

application

High output humbucker built for aggressive playing styles. Recommended for old school metal, nu-metal, gothic, garage, punk, thrash and other heavy rock styles. Great for drop tunings.

description
Yields high output while retaining clarity. The massive ceramic magnet and hot coil windings deliver tremendous power and raw distorted rock sounds. More aggressive than the SH-5 Duncan Custom. Comes with four-conductor hookup cable

complete setup
Available for both neck and bridge positions. Often a Distortion bridge is paired with an SH-2n Jazz Model in the neck for good clean tones and versatility.

guitars
For balanced and warm instruments. Works especially well with rosewood fingerboards.

players
John Connolly / Sevendust (bridge), Jerry Horton / Papa Roach (bridge), Meegs Rascon / Coal Chamber (bridge), Wayne Static / Static X (bridge), Eric Peterson / Testament (bridge)

SH-6 Distortion Trembucker Pickup
Our Price: $72.95
Select Color

See more Electric Guitar Pickups
Ships Free in the US
International Shipping Priority

$20.00

International Shipping Express

$30.00