About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
Email Us
Home

We are an authorized dealer for Seymour Duncan products. By purchasing from us, you are assured of professional and efficient service.

Manufacturer's Warranty applies.

The Tone Wizard
Choosing and Installing the Right Pickup
FAQ
Warranty Information

Seymour Duncan TB-10 Full Shred Trembucker  Pickup    
Item Number 11103-64

Retail Price: $114.00

Trembucker: For use where Bridge string spacing exceeds 2.00" (50mm) measured center of high string to center of low string (Strat's, etc)

This pickup has a throaty, expressive sound that brings out the subtlest nuances in your playing. With a high overdrive amp setting, you get a thick, singing tone.  When used with less distortion, the sound is clear and bluesy.
Alnico 5 magnets give the Full Shred pickup medium output and rich harmonics.  Two rows of adjustable allen screw pole pieces allow you to fine tune the brightness for just the right amount of cut.  Combined with the other Full Shred position model, you get a humbucking set-up designed to meet the needs of the most discriminating modern rock guitarist

This pickup is a direct replacement and requires no guitar modification.  Wiring schematic and mounting screws are included. 

application
High output tone for heavy rhythms and speed riffs. Used for classic rock, heavy rock, hip hop, fusion and aggressive solo playing.

description
Double rows of Allen screw pole pieces help fine tune the high end, leaving a tone that's fat and chunky, yet perfectly defined for speed riffs. Gives tonal control in high-gain situation. Less aggressive than an SH-6 Distortion. More articulate than an SH-5 Custom. Comes with four-conductor hookup cable.

complete setup
Available in both neck and bridge models-- most commonly used in the bridge position. The Full Shred neck pickup has reduced output and more treble for tonal versatility.

guitars
For balanced and warm instruments. Works especially well with rosewood fingerboards.

players
Riggs/Rob Zombie (bridge), Phil Campbell/Motorhead (bridge), Chris Rest/Lagwagon (bridge)

SH-10 Full Shred Trembucker Bridge Pickup
Our Price: $79.95
Select Color

See more Electric Guitar Pickups
Ships Free in the US
International Shipping Priority

$20.00

International Shipping Express

$30.00