About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Fri 9-5:00 p.m. E.S.T.)
Email Us
Home

$44.00

Also Recommended
Ibex Crack Repair Splint Former



One of the most difficult guitar repair jobs—splinting a separated crack—is now easy, thanks to two new tools from designer Irving Sloane.
The Crack Repair Knife uniformly tapers the crack opening. Its bronze handle has a rectangular base which can be drawn against a straight edge, ensuring a straight cut for the length of the crack. The depth of the blade tip is adjustable, to maintain a uniform taper.

Ibex Splint Knife