About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
Email Us
Home

We are an authorized dealer for Seymour Duncan products. By purchasing from us, you are assured of professional and efficient service.

Manufacturer's Warranty applies.

The Tone Wizard
Choosing and Installing the Right Pickup
FAQ
Warranty Information

Seymour Duncan   Vintage Flat SSL-2 Pickup
Color: Black, White (Covers included FREE)
Item Number 11201-03

Retail: $76.00

application
Flat pole piece, vintage-voiced, true single-coil for warm instruments. Recommended for country, pop, surf, rockabilly, blues, ska and classic rock.

description
This pickup combines the same vintage coil design as the SSL-1, with hand ground rod Alnico 5 magnets of equal length raised above the flatwork. The flat magnet pattern provides the balanced field necessary for an even response using today's strings (unwound "G") and flatter neck radii. The more even output response is noticed when bending strings. Like the SSL-1, the pickup is clean and vintage-like with a bright "bell" tone that has a sharper attack characteristic compared to the APS-2. Comes with waxed cloth hookup cable and vintage-style "keyed" bottom plate.

complete setup
Calibrated set available with RW/RP middle pickup.

guitars
For warmer toned ash, alder or basswood body instruments. Works especially well with rosewood fingerboards.

available mods
Reverse wound, reverse polarity (RW/RP) middle pickups for hum canceling in positions "2" and "4" on the five-way switch.

players
Nick Lashley / Alanis Morissette & Mick Jagger, Marty Friedman / Megadeth, Stephen Carpenter / Deftones, Coleman Mellett / Chuck Mangione Group

Ships Free in the US
Our Price: $52.95
Select Color

See other Electric Guitar Pickups
SSL-2 Vintage Flat Pickup

$20.00

Int'l Shipping Priority
Int'l Shipping Express

$30.00