About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
Email Us
Home

We are an authorized dealer for Seymour Duncan products. By purchasing from us, you are assured of professional and efficient service.

Manufacturer's Warranty applies.

The Tone Wizard
Choosing and Installing the Right Pickup
FAQ
Warranty Information

Seymour Duncan SH-5 Custom Bridge Pickup   
Item Number 11102-17-B

Retail Price: $104.00

A favorite with rock players, this pickup has just the right balance of power, sustain, and distortion for a hard-driving, kicking sound.  It cuts through with a distinctive high-end and midrange attack.  Designed to accomodate floyd Rose, and similar locking bridges, the Custom Trembucker featurs expanded pole spacing for more balanced string response.  The thinness and lack of bottom-end associated with locking tremolo systems is eliminated.

This pickup is a direct replacement and requires no guitar modification.  Wiring schematic and mounting screws are included. 

application
"P.A.F. on steroids" tone. Used for classic rock, heavy rock, funk, punk, R&B, metal and drop-tunings.

description
Beefed up Patent Applied For tone for a hard-driving, kickin' sound with the right balance of power, sustain, and distortion. This pickup cuts through with a distinctive high end and midrange attack. The ceramic magnet and custom coil design give it compressed dynamics, an enhanced harmonic structure, and a punchy bass. Perfect for dropped tunings without "mushing" out. Comes with four-conductor hookup cable.

complete setup
Recommended for bridge position. Often a Duncan Custom is paired with an SH-1 '59 in the neck for bigger P.A.F. tones in the bridge and vintage-correct P.A.F. tones in the neck.

guitars
For balanced and warm instruments. Works especially well with rosewood fingerboards.

players
Mike Chlasciak / Halford (bridge), Whitey Kirst / Iggy Pop (bridge), Rick Jackett / finger eleven (bridge), Will Adler & Mark Morton / Lamb of God (bridge)


SH-5 Custom Bridge Pickup
Our Price: $72.95
Select Color

See more Electric Guitar Pickups
Ships Free in the US
International Shipping Priority

$20.00

International Shipping Express

$30.00