

We are an authorized dealer for Seymour Duncan products. By purchasing from us, you are assured of professional and efficient service.
Manufacturer's Warranty applies.

Seymour Duncan SH-13 Dimebucker Bridge Pickup (color: Black)
Item Number 11102-82-B
Retail Price: $135.00
If you've followed Pantera's and Damageplan's rise to the top of the metal heap, then you're already well aware of the searing, crushing metal barrage that was Dimebag Darrell's signature guitar tone.
Now that tone is yours with the SH-13 Dimebucker.
The Dimebucker uses a powerful ceramic magnet coupled with stainless steel blades for boot-kickin' attitude.
The secret to the Dimebucker's hard-hitting crunch, is the small amout of metal mass in the core of the pickup. This allows the SH-13 to have both high d.c. resistance and a high resonant peak.
The result is a high-output, aggressive humbucker with lots of treble bite and clarity, as well as punchy bass response and exceptional dynamics.
Works well with both tube and solid-state amps.
This pickup is a direct replacement and requires no guitar modification. Wiring schematic and mounting screws are included.
application
Ultra high output blade humbucker built for aggressive playing styles. Recommended for rock, metal, hard-hitting solos and other heavy rock styles.
description
The Dimebucker uses a powerful ceramic magnet coupled with stainless steel blades for hard-hitting crunch. The SH-13 has both high d.c. resistance and a high resonant peak. The result is a high-output, aggressive humbucker with more treble bite and clarity than an SH-8 Invader; as well as punchy bass response and exceptional dynamics. The blades make the Dimebucker great for balanced bends. Comes with four-conductor hookup cable and its own form-fitting mounting ring.
complete setup
Recommended for bridge position. Dimebag used a '59 Model in the neck for P.A.F. tones.
guitars
For all instruments. The double blades make this pickup suitable for both humbucker and Trembucker string spacings
available mods
Comes in any color you want. As long as it's black.
players
Dimebag Darrell / Damageplan & Pantera, Mark Morton / Lamb of God
$20.00
$30.00