About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Fri 9-5:00 p.m. E.S.T.)
Email Us
Home

SH-1n Nickel Neck Pickup
Price $89.95


SH-1b Nickel Bridge Pickup
Price $89.95


SH-1n Nickel 4 Conductor Neck Pickup
Price $99.95


SH-1b Nickel 4 Conductor Bridge Pickup
Price $99.95

This pickup is a faithful replica of the great old 1959 "Patent Applied For" humbucker.  The tone is smooth and warm.  Sustain is plentiful.
The same kind of Alnico magnets, plain enameled wire, braided single-conductor hookup cable, nickel plated studs, wooden spacer, black paper tape, and balanced coil windings that were used on the originals are used here in the '59.  Even the square pin hole with the distinctive 'Paten Applied for" recessed molding ring on the top of the bobbin is included.
The neck and bridge models are individually calibrated for an even volume balance.  The bridge packs a little extra punch and the neck is warm with just the right amout of bass.
This pickup is a direct replacement and requires no guitar modification.  Wiring schematic and mounting screws are included. 

application
Versatile P.A.F.-type humbucker. Great for country, jazz, blues, funk, classic rock and heavy rock.

description
Late-'50s, vintage-correct, humbucker sound. Warm and crystalline clean tones. Full and bright distorted tones. Smooth sustain. Classic appointments include plain enamel wire, long legged bottom plate, vintage single conductor cable and no logo. Compared to the SH-55 Seth Lover, the '59 has slightly more scooped mids and is vacuum wax potted for squeal-free performance.

guitars
For balanced and warm instruments. Works especially well with mahogany bodies and rosewood fingerboards.

players
Ben Harper (neck & bridge), Robben Ford (neck & bridge), Mike Einzinger / Incubus (neck), Robert Smith / The Cure

Personal Note:
I have used this on a Fender HIghway One HSS Strat with SSL-1 neck and middle (No RWRP) and LOVED it.

 

International Priority
Price $15.00


International Express
Price $30.00

Free Shipping in US, Canada and Territories

Global Shipping:
$15.00 Priority
$30.00 Express
FREE SHIPPING for more than one pickup

All pickups include tracking and insure

SH-1n White Neck Pickup
Price $72.95


SH-1b White Bridge Pickup
Price $72.95


SH-1n White 4 Conductor Neck Pickup
Price $82.95


SH-1b White 4 Conductor Bridge Pickup
Price $82.95

SH-1n Black Neck Pickup
Price $72.95


SH-1b Black Bridge Pickup
Price $72.95


SH-1n Black 4 Conductor Neck Pickup
Price $82.95


SH-1b Black 4 Conductor Bridge Pickup
Price $82.95

 

SH-1n Reverse Zebra Neck Pickup
Price $72.95


SH-1b Reverse Zebra Bridge Pickup
Price $72.95


SH-1n Reverse Zebra 4 Conductor Neck Pickup
Price $82.95


SH-1b Reverse Zebra 4 Conductor Bridge Pickup
Price $82.95

SH-1n Zebra Neck Pickup
Price $72.95


SH-1b Zebra Bridge Pickup
Price $72.95


SH-1n Zebra 4 Conductor Neck Pickup
Price $82.95


SH-1b Zebra 4 Conductor Bridge Pickup
Price $82.95