About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
Email Us
Home

We are an authorized dealer for Seymour Duncan products. By purchasing from us, you are assured of professional and efficient service.

Manufacturer's Warranty applies.

The Tone Wizard
Choosing and Installing the Right Pickup
FAQ
Warranty Information

Seymour Duncan SH-1 1959 7 String Humbucker Pickup  (Neck or Bridge Models)
4 wire conductor cable
Color: Black Only

Retail: $114.00

 

This pickup is a faithful replica of the great old 1959 "Patent Applied For" humbucker.  The tone is smooth and warm.  Sustain is plentiful.
The same kind of Alnico magnets, plain enameled wire, braided single-conductor hookup cable, nickel plated studs, wooden spacer, black paper tape, and balanced coil windings that were used on the originals are used here in the '59.  Even the square pin hole with the distinctive 'Paten Applied for" recessed molding ring on the top of the bobbin is included.
The neck and bridge models are individually calibrated for an even volume balance.  The bridge packs a little extra punch and the neck is warm with just the right amout of bass.
This pickup is a direct replacement and requires no guitar modification.  Wiring schematic and mounting screws are included. 

application
Versatile P.A.F.-type humbucker. Great for country, jazz, blues, funk, classic rock and heavy rock.

description
Late-'50s, vintage-correct, humbucker sound. Warm and crystalline clean tones. Full and bright distorted tones. Smooth sustain. Classic appointments include plain enamel wire, long legged bottom plate, vintage single conductor cable and no logo. Compared to the SH-55 Seth Lover, the '59 has slightly more scooped mids and is vacuum wax potted for squeal-free performance.

guitars
For balanced and warm instruments. Works especially well with mahogany bodies and rosewood fingerboards.

players
Ben Harper (neck & bridge), Robben Ford (neck & bridge), Mike Einzinger / Incubus (neck), Robert Smith / The Cure

 

Ships Free in the US
Our Price: $79.95
Select Color

See other Electric Guitar Pickups
Bridge Pickup
Neck Pickup
Our Price: $79.95
Select Color

Int'l Shipping Priority

$20.00

Int'l Shipping Express

$30.00