About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
Email Us
Home

We are an authorized dealer for Seymour Duncan products. By purchasing from us, you are assured of professional and efficient service.

Manufacturer's Warranty applies.

The Tone Wizard
Choosing and Installing the Right Pickup
FAQ
Warranty Information

Seymour Duncan SFX-02 Tweak Fuzz Effects Pedal
Item Number 11995-02

Retail Price: $149.95

application
Production version of boutique fuzz pedal that features a six-position "Tweak" control for tonal versatility. Great for pop, classic rock, heavy rock, punk and metal.

description
The Tweak Fuzz features a six-position "Tweak" switch to voice the fuzz tone. This basic tone will be familiar to those who remember the rich, lush, vintage fuzz tones of the '60s pop festivals. But with the addition of the Tweak switch, the player can now create a myriad of totally unique fuzz tones, making the Tweak Fuzz an incredibly versatile pedal for electric guitar and bass. Discrete, Class A, low-noise transistor with true bypass. Steel chassis. Runs on a single 9 volt battery.

players
Blues Saraceno

 

Ships Free in the US

$99.95

See other Stompboxes and Effects Pedals
Our Price
International Shipping Priority

$20.00

International Shipping Express

$30.00