About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Fri 9-5:00 p.m. E.S.T.)
Email Us
Home

We are an authorized dealer for Seymour Duncan products. By purchasing from us, you are assured of professional and efficient service.

Manufacturer's Warranty applies.

Seymour Duncan SA-6 Pickup
Item Number 11520-21

Retail Price: $410.00

Application
High-end, active, magnetic soundhole pickup with internal microphone and on-board buffering and blending.

Description
Professional-level hum canceling Stack® pickup mated with an on-board omni-directional electret condenser microphone. The entire tonal spectrum of the acoustic guitar is accurately amplified. Includes master volume control and mic blend control. The magnetic pickup is always on. Blending in the mic adds sparkle and detail to the overall tone. Blending out the mic makes the pickup more feedback resistant. Twelve adjustable pole pieces allow for the best possible string balance regardless of neck radius.

For left handed applications, you need to reverse the poles on both E strings, and the A and B strings.  A small tool is included to do this, and can be done in just minutes.

Guitars
High-quality 6- and 12-string acoustic guitars with sound holes between 3.85" and 4.10."

Players
Ben Harper, David Lindley, Lenny Kravitz, Keb' Mo', Jeff Pevar / CSN, Kelly Joe Phelps, Peter Stroud / Sheryl Crow, Xavier Rudd, Bill Frisell

 

The SA-6 Ships Free

$228.95