Pilgrims Projects • 269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
We are an authorized dealer for Fishman products. By purchasing from us, you are assured of professional and efficient service.
Manufacturer's Warranty applies.
Fishman Onboard Aura Acoustic Guitar Pickup
This Fishman is offering Onboard Aura to the consumer market for new installations or
for those who want to replace their old preamp with the state-of-the-art in
acoustic amplification. Features Fishman's Aura Image Gallery Software
(included), an application that allows users to access Images for hundreds of
guitar makes and models through Fishman's free Aura Image library. The software
also allows Aura Images to be sorted, managed, and grouped right on your
computer. Users can then take advantage of the preamp's open architecture by
loading Aura Images via a USB cable.
- State-of-the-art onboard preamp featuring Fishman's patented Acoustic imaging Technology
- Includes Fishman's Aura Image Gallery Software, an application that allows users to access Images for hundreds of guitar makes and models through Fishman's free Aura Image library
- Open architecture allows 6 Aura Images to be loaded onto the preamp
- Pickup/image blend control
- Volume control as well as bass, treble, and a fixed frequency mid control to isolate certain frequencies and boost or cut them as needed
- Digital and fully-programmable equalization
- Feedback-fighting phase control
- Built-in tuner with LED display
- Automatic anti-feedback
- Low battery indicator
- Unique pivot design for instant 9V battery access
- System includes an Acoustic Matrix Undersaddle Pickup and Switchjack Stereo Endpin Jack
- Available with wide or narrow pickup formats (special orders for split format pickups)
FISHMAN #
PRO-MAT-OBA (1/8 in (3.2mm) Wide Pickup
FISHMAN # PRO-MAN-OBA (3/32 in (2.3mm) Narrow Pickup
RETAIL: $679.95
FISHMAN # PRO-MAL-OBA (3/32 in (3.2mm) Narrow/Split Pickup to accomodate Lowden and some model Takamine Guitars
RETAIL $775.00
Narrow/Split Pickup Format
Purchase the Onboard Aura
Narrow or Wide Pickup Format
Int'l Shipping: No Tracking or Insurance
Int'l Shipping: Tracking and Insurance
Fishman Onboard Aura Pro (same features as above but 1/3 smaller and allows 4 images rather than 6.
Purchase the Onboard Aura Pro
Narrow or Wide Pickup Format