All Mandolin Plans are Full size working drawings.
Dimensions not noted may be scaled.
There may be more than one sheet per design depending on the Instrument.
All plans are designed by Scott Antes unless otherwise specified.

Flat Top (similar to early Martin or Stewart)
S30
$6.50
A style Arched Top and Back
1920's Gibson A-2 Style
AUTHENTIC
S31
Taken from actual instrument
13.75 Open String Length
20 frets