About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
Email Us
Home

We are an authorized dealer for Fishman products. By purchasing from us, you are assured of professional and efficient service.

Manufacturer's Warranty applies.

Fishman Classic Series M-100 Pickup
Item PRO-M10-OMA

Retail: $179.95

M-100 Mandolin Pickup

A Piezo-Ceramic pickup element is embedded in an adjustable ebony replacement bridge for archtop style mandolins. Comes complete with a 1/4" external jack for easy mounting. An impedance matching preamp is recommended, but not required. Professional installation is recommended.

Artists:
Black Crowes
Kris Delmhorst
Ani DiFranco
Duke Levin
Tim O'Brien
Ellis Paul


Ships Free in the US
Our Price: $119.95

$20.00

Int'l Shipping Priority
Int'l Shipping Express

$30.00

Fishman Classic Series M-200 Professional Pickup
Item PRO-M20-OMA

Retail: $239.95
Our Price: $159.95

M-200 Professional Mandolin Pickup

The same as the M-100, but includes a Carpenter style 1/4" output jack that mounts on the side of the instrument. An impedance matching preamp is recommended, but not required. Professional installation is recommended.

Artists:
Merri Amsterberg
Ani DiFranco
Mark Erelli
Hoot Hester
Hootie and the Blowfish
Al Kooper

Fishman Nashville Series Archtop M-300 Pickup (2PC)
Item PRO-M30-OMA

Retail: $309.95
M-300 Archtop Mandolin Pickup

The M-300 Archtop Mandolin Pickup features a piezo-ceramic pickup element embedded in the bottom bridge, and an adjustable ebony replacement bridge. Designed for all archtop-style mandolins, it includes a Carpenter 1/4' output jack that mounts on the side of the instrument.

  • Accurate reproduction of your instrument's unique acoustic sound
  • Consistent sound for every performance
  • An impedance matching preamp is recommended, but not required
  • Professional installation is recommended
Our Price: $199.95

Fishman Nashville Series Flat-Top M-400 Pickup
Item PRO-M40-OMA

Retail: $309.95
Our Price: $199.95

M-400 Flat-top Mandolin Pickup

The M-400 Flat-top Mandolin Pickup features a piezo-ceramic pickup element embedded in a quality rosewood bridge and includes a Carpenter 1/4' output jack that mounts on the side of the instrument

Recommended Fishman Preamps
Fishman G-ll
Fishman Pro-EQ ll