Pilgrims Projects • 269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
We are an authorized dealer for Fishman products. By purchasing from us, you are assured of professional and efficient service.
Manufacturer's Warranty applies.
Narrow or Wide Pickup Format
- Combines the Matrix under-saddle element with the Ellipse preamp, unit mounts on the underside of the top at the soundhole, easily accessed controls include volume, tone, and phase, signal routes to a standard 1/4" endpin jack.
Available in 2 pickup widths:
FISHMAN # PRO-MAT-EL3 (1/8 in (3.2mm) Wide Pickup
FISHMAN # PRO-MAN-EL3 (3/32 in (2.3mm) Narrow Pickup
RETAIL: $215.96
- This innovative soundhole mount preamp / mic for acoustic guitar is designed to be wired into a Fishman Acoustic Matrix pickup.
The unit mounts easily on the underside of the top (without any permanent alteration to the guitar) and has a small mic attached to a gooseneck. Controls, which are accessible at the edge of the soundhole include a phase switch, volume control and pickup/mic blend control.
This is a pramp upgrade for users of the Acoustic Matrix System
FISHMAN # PRO-ELL-100
RETAIL: $138.78
- Combines the Matrix under-saddle element with the Ellipse Blend preamp / microphone, unit mounts on the underside of the top at the soundhole, easily accessed controls include mic/pickup blend, volume and phase, signal routes to a standard 1/4" endpin jack, professional installation is recommended. Available in 2 pickup widths.
FISHMAN # PRO-MAT-EL2 (1/8 in (3.2mm) Wide Pickup
FISHMAN # PRO-MAN-EL2 (3/32 in (2.3mm) Narrow Pickup
RETAIL: $319.95
Standard Features are:
- Super low-noise onboard preamp system
- Ergonomic soundhole-mounted desigh puts slider controls at your fingertips to maintain a natural playing position
- Unique patent-pending neodymium magnetic mounting system for easy, solder-free installation
- Accommodates most round soundholes from 3-7/8" (98mm) to 4-1/8" (105mm) in diameter
- Phase switch (feedback control)
- Mic trim control
- Ellipse VT and Ellipse Matrix Blend models include:
- solderfree Acoustic Matrix Undersaddle Pickup in narrow 3/32" (2.3mm) or wide 1/8" (3.2mm) format
- switchable Natural l and Natural ll low frequency tone shaping built into preamp
- gooseneck MIni-Mic that allows for convenient mic/pickup blending
About the Fishman Ellipse:
Fishman Ellipse Matrix VT System (Shown at top of page)
Fishman Ellipse Matrix Blend System
Narrow or Wide Pickup Format
Int'l Shipping: No Tracking or Insurance
Int'l Shipping: Insurance and Tracking