About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
Email Us
Home

We are an authorized dealer for Fishman products. By purchasing from us, you are assured of professional and efficient service.

Manufacturer's Warranty applies.

Fishman Loudbox Performer Amplifier

$799.95

FREE U.S SHIPPING! .

Introducing the 130-watt Loudbox Performer, the newest addition to the powerhouse family of Loudbox acoustic instrument amplifiers.

With all the features a gigging performer demands, this two-channel amplifier is lightweight, compact, and ultra-flexible. Three bands of EQ with feedback-fighting controls give you incredible control over your tone.

As with the rest of the Loudbox family, the Loudbox Performer implements an unprecedented triamplified design using select speaker components to give you the most natural reproduction of your instrument. Three amps and high-quality drivers mean you sound clean and clear, but you get hear like never before.

The powerful and lightweight Fishman Loudbox Performer combines superior acoustic tone with performance-oriented control features in a simple, elegant design.

The Loudbox Performer delivers 130 watts of tri-amplified power capable of producing the rich, full-bodied sound demanded by professional acoustic musicians. The two channels offer 3 Bands of EQ which for exceptional tone-shaping capability.

Featuring a custom-designed speaker array with dual woofers for deep bass reproduction, the Loudbox Performer offers both a dedicated instrument channel and mic/instrument channel with phantom power for more versatility.

Digital Effects (Including Hall 1 & 2, Chorus, and Plate 1 & 2) are available for additional sound shaping, and the Performer?s tilt-back design includes a single-position kick-stand to easily achieve the optimal listening position. Additional user-features include dual effects loops; balanced DI outputs for each channel and mix DI Output; a Tuner output and Mute footswitch jack; and an Aux input for jam-along or set-break tunes.

The Loudbox Performer is designed to offer all of the sophisticated acoustic amplification of the Loudbox line in a versatile, compact and cost-effective format ideal for performers at every level of development.

Technical Info

130W RMS, cumulative, tri-amped power with active crossover

2 x 6.5 in. Woofer: 80W amplifier

4 in. Cone Midrange: 40W amplifier

1 in. Neodymium Soft-Dome Tweeters: 10W amplifier

SPL @ 1 Meter: 117dB SPL

Channel 1 - Dedicated Instrument Channel
-- Input Gain with 10dB Pad & Clip Indicator

-- Shelving Bass and Treble

-- Resonant-style Midrange

-- Effects Level

-- Notch Filter (feedback control)

-- Phase Switch (feedback control)

-- Dedicated Effects Loop

-- 1/4 in. Input

Channel 2 - Instrument or Microphone Channel
-- 48V Phantom Power

-- Input Gain with 10dB Pad & Clip Indicator

-- Shelving Bass and Treble

-- Resonant-style Midrange

-- Effects Level

-- Notch Filter (feedback control)

-- Phase Switch (feedback control)

-- Dedicated Effects Loop

-- 1/4 in. Input & Balanced XLR Input

Auxiliary Stereo Input with Level Control

Digital Effects: Hall 1&2, Plate 1&2, Chorus, Master Level

D.I. Output: Balanced XLR for Channel 1, 2, and Main Mix

Tuner Output

Mute: Mutes Channel 1 and 2

Footswitch: Remote Mute Control

Kickstand: Adjusts baffle from 10 to 45 degrees

Dimensions: 19.2 in. H x 15.5 in. W x 11.2 in. D

Weight: 35 lbs (15.9kg)

FISHMAN # PRO-LBX-300
RETAIL: $1149.95

Int'l Shipping: Tracking and Insurance

$150.00