


We are an authorized dealer for Fishman products. By purchasing from us, you are assured of professional and efficient service.
Manufacturer's Warranty applies.
FISHMAN PRO-EQ PLATINUM PREAMP/EQ/DI
FREE SHIPPING IN THE U.S.
$139.95

Features:
- Input gain and master volume controls
- Feedback-fighting phase switch
- XLR D.I. (with ground lift and pre/post switches) for pro-sound and recording
- Exclusive voltage doubler circuit for more clarity and greater dynamics
- Easy access battery compartment
- Tuner/send output
- Rugged injection molded case
- 3-way power from 9V battery, 48V phantom or AC adapter
Pro-EQ Platinum additional features:
- Fishman's premium preamp/D.I., dialed in just for the acoustic player
- Four-band acoustic EQ with sweepable mid-range
-
Feedback-fighting notch filter
- Smooth control; Fishman's exclusive acoustic compression smooths our amplified acoustic sound.
FISHMAN # PRO-PLT-101
RETAIL: $209.95
FISHMAN PRO-EQ PLATINUM BASS PREAMP/EQ/DI
FREE SHIPPING IN THE U.S.

Besides all of the above features, the Pro-EQ Platinum Bass includes:
- Fishman's premium Preamp/D.I., developed for the acoustic and electric bassist
- Five band EQ precisely shapes and sculpts bass tone
- Soft-knee, pump free, photo-optic bass compressor
- Depth knob (low cut filter) for big bottom without boom
FISHMAN # PRO-PLT-BAS
RETAIL: $209.95
$139.95
$20.00
$30.00