Pilgrims Projects • 269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
Be sure to visit tour Music Wire section for our large selection of wire for your Hammered Dulcimer or Zither.
50 Blued Steel Dulcimer Tuning Pins A24
50 Hammered Dulcimer Hitch Pins A25
GHS Dulcimer Strings
Grover Black Plastic "Sta-Tite" Dulcimer Pegs A19
50 Bright Steel Dulcimer Tuning Pins A23
For Zithers, Psalteries, Hammered Dulcimers, etc.
.198 dia X 1-5/8 long
Same as above application but with a Saphire blued finish. Definately a beautiful accent!
.146 dia X 1-1/2 inches long
Nickel Plated Iron
Custom Formula Series. Four string sets for traditional tuning (C, C, C, G). stainless steel, loop ends 45" long
List $6.00
Same specifications as above, but with Plastic Tuners
Dulcimer Accessories
Gooseneck Dulcimer Tuning Wrench A24A
8" Long with 4" Hardwood handle. One Piece chrome plated shaft and tuning head with star tip.
Enclosed Gear Machine Heads, Chrome Finish
Set of 4 DP-1
These machine heads with sealed and enclosed gears have a 14:1 gearing ratio and have small chrome buttons. When mounting, they require a hole that is 3/8" in diameter. These machine heads are perfect for vertical mounting on flat pegheads, but may require some modification for horizontal mounting on dulcimers.
Enclosed Gear Machine Heads, Black Chrome Finish
Set of 4 DP-2
Same spec's as DP-1
Enclosed Gear Machine Heads, Gold Finish
Set of 4 DP-3
These machine heads with sealed and enclosed gears have a 14:1 gearing ratio and have small chrome buttons. When mounting, they require a hole that is 3/8" in diameter. These machine heads are perfect for vertical mounting on flat pegheads, but may require some modification for horizontal mounting on dulcimers
Grover "Perma Tension" Tuning Pegs
Set of 4 DP-4
Easily keep your dulcimer in tune while still having the feel of traditional pegs with these tuning pegs made by Grover. Each peg will securely mount to your instrument (requires a 5/16" hole and a minimum sidewall thickness of 7/16") and provides its own friction surfaces so you don't need to rely on friction against wood.
Open Gear Chrome Button Tuning Machine Pegs -
Set of 4 - DP-5
These machine heads have open gears and a small chrome button. The post is 1 1/8" long with a diameter of 1/4" and has two holes in it. The machine head can be used for either vertical or horizontal mounting.
Open Gear Pearloid Button Tuning Pegs
Set of 4 DP-6
These machine heads have open gears and a small pearloid button. The post is 1" long with a diameter of 7/32" and has two holes in it. The machine head can be used for either vertical or horizontal mounting. (Set of four includes two left side and two right side tuners.)
Planetary Pegs with Pearloid Buttons
Set of 4 DP-7
These planetary tuning pegs are perfect for horizontal mounting on scrolled dulcimer heads (and many other applications). They require a wall thickness of at least 5/16" and a hole size of 3/8".
Schaller Chrome Mini Tuning Machine Heads
Set of 4 DP-8
These fully enclosed mini machine tuning heads are perfect for horizontal mounting on your dulcimer. Each head has a 14:1 gearing ratio and requires a 3/8" hole for mounting.
Schaller Gold Mini Tuning Machine Heads
Set of 4 DP-9
These fully enclosed mini machine tuning heads are perfect for horizontal mounting on your dulcimer. Each head has a 14:1 gearing ratio and requires a 3/8" hole for mounting
Open Gear Ivory Colored Button Tuning Machine Pegs - Set of 4 - DP-10
These machine heads have open gears and a small Ivory colored button. The post is 1 1/8" long with a diameter of 1/4" and has two holes in it. The machine head can be used for either vertical or horizontal mounting.
Molded Delrin Bridge/Nut Stock
DN-1 (2 pieces 1-3/8 inch wide)
Micarta Bridge/Nut Stock
DN-2 (2 pieces 3-1/4 long)
Black Oxide Dulcimer Hitch Pins
1/8 x 1-1/8" Long
D'ADDARIO J64 LAP DULCIMER STRINGS
- Strings are loop end, nickel wound, 012 012 014 022w.
List $5.59
DARCO D4000 LAP DULCIMER SET
- Strings are nickel wound, loop end, 012 012 012 022w.
List $4.85
JOHN PEARSE 5000 LAP DULCIMER SET
- Strings are loop end, 80/20 bronze wound, 009 010 012 023w.
List $6.20
Martin Dulcimer Strings
Strings are loop end, nickel wound, 012 012 012 022w.
List $5.50