About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
Email Us
Home

We are an authorized dealer for Seymour Duncan products. By purchasing from us, you are assured of professional and efficient service.

Manufacturer's Warranty applies.

The Tone Wizard
Choosing and Installing the Right Pickup
FAQ
Warranty Information

Seymour Duncan LW-CH2s Classic 2 Active Humbucker Pickup  Set
Neck and Bridge Model
Color: Black
Item Number 11106-06-B

Retail: $261.00

application
Nine-volt active humbucker with classic voicing. Great for pop, country, blues, classic rock and heavy rock.

description
The tone is full-bodied with a wide frequency response and rich sustain. They have a potent sound that lets you hear every note in the chord. The newly redesigned 9-volt preamp gives more headroom than other active pickups for improved tonality and increased dynamic range. These humbuckers do not have a split coil mode.

complete setup
Available in neck and bridge set. Many extreme metal players use a Blackouts in the bridge position and a LiveWire Classic II in the neck. Includes mounting ring, pots, battery clips, stereo jack and wire.

guitars
Any humbucker guitar with vibrato or hard-tail bridge.

available mods
Black or white.

players
Phil Campbell / Motorhead, Lord Ahriman / Dark Funeral

Ships Free in the US
Our Price: $182.95
Select Color

See other Electric Guitar Pickups
Neck and Bridge Pickup Set

$20.00

Int'l Shipping Priority
Int'l Shipping Express

$30.00