Benedetto® Pickups
The Signature Jazz Guitar Pickup.™
The “S” and “B” Ebonova™ Series: Both “S” and “B” pickups are naturally-voiced. A good archtop guitar has balance, warmth and richness. These pickups mirror those same qualities and bring out the true acoustic essence of a fine guitar. The unique black-flamed Ebonova covers with the embedded Benedetto logo reflect the natural figuring of the guitar’s tone woods.
S-Series These pickups were designed for the purist who plays a true acoustic archtop without a pickup routed in the guitar’s top. With the “S” installed, the guitar isn’t, strictly speaking, an electric guitar: it’s an amplified acoustic. Designed to be compatible with steel, nickel and bronze strings. Pickguard (floating) mount.
Wiring Schematic
B-Series This is basically a “built-in” version of the S-Series. It maintains the same natural acoustic qualities of the instrument. According to Bob Benedetto, this pickup is “the best sounding jazz pickup I’ve ever heard. There isn’t even a close second.” Standard mount.
Wiring Schematic
International Priority
Price $15.00
International Express
Price $30.00
Free Shipping in US, Canada and Territories
Global Shipping:
$15.00 Priority
$30.00 Express
FREE SHIPPING for more than one pickup
All pickups include tracking and insurance
B-6 (6 string)
Price $135.00
B-7 (7-string)
Magnet Alnico V Bar
Cable 4-Conductor shielded. Allows multiple wiring options.
DC resistance 14.05 K Ohms
Inductance 7.00 H
Resonant Frequency
Series - 4.28 KHz
Split - 7.91 KHz
Body Measurements - 3.17 x 1.55 x .79"
Centers of Mounting Legs - 3.465"
Part No. - 11601-05
B-7 (7 string)
Price $135.00
S-6 (6-string)
Magnet Alnico V Bar
Cable Miniature single conductor co-axial.
DC resistance 9.55 K Ohms
Inductance 3.95 H
Resonant Frequency 5.38 KHz
Body Measurements 2.80 x 1.26 x .440"
Part No. 11601-01
Price $135.00
Magnet Alnico V Bar
Cable Miniature single conductor co-axial.
DC resistance 8.80 K Ohms
Inductance 4.37 H
Resonant Frequency 4.40 KHz
Body Measurements 3.09 x 1.26 x .440"
Part No. 11601-02
Price $135.00

