About Us
Ordering Information
Contact Us
Pilgrims Projects269-945-5079 (Mon-Sat 9-9:00 p.m. E.S.T.)
Email Us
Home

We are an authorized dealer for Seymour Duncan products. By purchasing from us, you are assured of professional and efficient service.

Manufacturer's Warranty applies.

The Tone Wizard
Choosing and Installing the Right Pickup
FAQ
Warranty Information

Seymour Duncan Twang Banger Pickup
Color: Black, White
Item Number 11204-20

Retail: $99.00

application
True single-coil pickup that makes a Strat sound like a Tele. Recommended for country, pop, rockabilly, blues, jam, classic rock and heavy rock.

description
If you want the twangy, muscular punch of a gutsy Tele® in your Strat®, the APST-1 is for you. One of the secrets is the copper-coated steel bottom plate. Combine that with the aggressive coil windings, the Alnico 2 magnets wrapped in plain enamel wire, and the result is a high-output, single-coil, twang-beast.

complete setup
Recommended for the bridge position with either APS-2s (for a maple fingerboard) or SSL-2s (for a rosewood fingerboard) in the neck and middle positions.

guitars
For all well-balanced instruments. Works equally well with maple and rosewood fingerboards

available mods
Reverse wound, reverse polarity (RW/RP) middle pickups for hum canceling in positions "2" and "4" on the five-way switch.

players
Peter Stroud / Sheryl Crow, Chuck Garvey / moe., Ric Latina / John Berry & Rhonda Vincent

Ships Free in the US
Our Price: $68.95
Select Color

See other Electric Guitar Pickups
APST-1 Twang Banger Pickup

$20.00

Int'l Shipping Priority
Int'l Shipping Express

$30.00